Contents:
|
Item |
Quantity |
Tools Req’d |
|
M8 x 50mm (8mm dia) Hex. Coach Bolt (BZP) |
2 |
Tape; Drill; |
|
M8 Thin Washer (BZP) |
2 |
Spirit Level; |
|
M8 Hafren Armour Ring |
2 |
6,5mm bit; |
|
M8 Plastic Bolt Head Cover |
2 |
M8 Socket; |
|
|
|
Hammer |
1. Select the lower location height so that the Bull Rack bars support under the top tube of the bike with the wheels of the bike a minimum of 50mm above the ground. When selecting a higher location for the Bull Rack remember that the bike has to be lifted up and over the upturned horns of the Bull Rack and the bike may weigh 20 kilo plus. Refer to Tower Construction Detail Sheet for suggested hole pattern.
2. Caution: Wear suitable eye protection when drilling holes.
3. Mark the hole locations and drill through 6.5mm dia at each location making sure that the drill is kept square to the mounting face.
4. Assemble the Bull Rack(s) with the 2 bolts supplied with a washer under the nut. Use an M8 socket or box spanner to tighten. Do not overtighten bolts. Check both supports are level.
5. It is also recommended that for maximum security, tap into place over the head of each bolt a Hafren Armour Ring. The black plastic domed covers can be used in place of the Hafren Armour Ring and superglued in place. (Glue not supplied). If in doubt on any aspect contact us by email or call 07767 484 465. Warning: The installation is not fully secure if Hafren not in place.
Full Architects / Planners / Installers Information – Application CLICK HERE